| E-25-339 | Solar | 09/25/2025 | INSTALL L-FEET, LAG BOLTS, FLASHING, AND RACKING FOR 14.720 KW ROOF-MOUNTED SOLAR PV SYSTEM.
INST |
| P-25-44 | Plumbing | 03/15/2025 | Replacing 2 water closets replacing master bath tub replacing master bath shower valve. Replacing ki |
| E-25-72 | Electrical | 03/09/2025 | REPLACE LIGHT FIXTURES, SWITCHES, AND OUTLETS IN KITCHEN AND BATHROOM |
| R-25-46 | Interior Renovation | 03/05/2025 | MASTER BATH REMOVE AND INSTALL NEW SHOWER TILE AND FIXTURES. NEW FLOOR TILE. NEW TOILET AND NEW TUB. |
| BRSW-24-296 | Exterior Renovation | 12/11/2024 | Strip off existing roofing to wood decking. Apply two courses of ice and water on entire perimeter, |
| 3496 | Residential | 09/09/2002 | CO'D POOL |
| 27428 | Residential | 04/05/1999 | EAF/FGR |