| HAC-25-143 | Air Conditioning | 08/04/2025 | INSTALLATION OF HEATING AND AIR CONDITIONING EQUIPMENT. INCLUDING VIESSMAN VR1-105 OIL BOILER WITH I |
| P-25-36 | Plumbing | 03/07/2025 | 2ND FLOOR BATH: ROUGH IN FOR TOILET, TUB/SHOWER AND VANITY. RUN NEW PVC DRAIN PIPE FROM BASEMENT TO |
| ST-25-3 | Tank | 02/10/2025 | SET 1-120 GALLON LP TANK ON BLOCKS RIGHT REAR CORNER OF THE GARAGE RUN 55' OF 3/4" CSST THROUGH THE |
| BRSW-24-184 | Exterior Renovation | 07/22/2024 | ROOFING AND WINDOWS. REMOVE OLD SHINGLES AND INSTALLATION OF NEW GAF TIMBERLINE SHINGLES. REBUILD 2N |
| R-24-145 | Garage | 07/22/2024 | BUMP OUT OF GARAGE DOORS. 3' X 23' |
| E-24-231 | Electrical | 07/10/2024 | Service upgrad 100-200 amps. Wiring for kitchen and bathroom remodels |
| R-24-144 | Interior Renovation | 07/01/2024 | NORTH SIDE FIRST FLOOR BEDROOM ADDITION. AND KITCHEN AND BATHROOM REMODEL. |
| 0035791 | Residential | 07/08/2008 | |
| 0035792 | Residential | 07/08/2008 | |
| 33849 | Residential | 08/21/2003 | INSTALL MULLION WINDOW/HIST DIST COMM APPROVAL |