| HAC-25-196 | HVAC | 10/03/2025 | WE WILL PROPERLY REPAIR THE DAMAGED SECTION OF SUPPLY AND RETURN DUCTWORK IN THE ATTIC. |
| R-25-128 | Deck | 06/13/2025 | 16 X 12 DECK TO EXISTING ABOVE GROUND POOL. NO STAIRS. 48" HIGH RAILING WITH STAINLESS STEEL CABLE S |
| E-25-162 | Electrical | 05/18/2025 | Adding a sub panel in garage |
| BRSW-25-54 | Roof | 03/28/2025 | STRIP EXISTING ROOF, ICE AND WATER PER CODE, SEAM TAPE PLYWOOD SEAMS AND SYNTHETIC, GAF SHINGLES |
| E-24-398 | Electrical | 12/03/2024 | DESCRIPTION OF WORK: -TRENCH -PVC CONDUIT FROM HOUSE TO POOL PUMP -DEDICATED 20 AMP GFCI CIRCUIT FOR |
| SW-24-18 | Above Ground Pool | 10/24/2024 | INSTALL NEW ABOVE GROUND POOL |
| P-20-65 | Plumbing | 12/09/2020 | RUN APPROX 30 FEET OF UNDERGROUND PIPING FROM TANK TO PLUMBERS APPROVED STUB. |
| ST-20-44 | Tank | 12/09/2020 | REPLACE 500 GALLON STEEL UNDERGROUND PROPANE TANK |