| 20-32 | Roof | 12/17/2024 | REMOVE EXISTING ROOFING SHINGLES, INSTALL GAF TIMBERLINE HDZ SHINGLES, INSTALL FULL ICE AND WATER SH |
| BRSW-24-231 | Windows/Doors | 10/01/2024 | Replacing (1) Series 4000 awning window; (1) patio door; (1) entry door. U-value .28 or lower. No st |
| SFT-22-28 | Shed | 12/01/2022 | PURCHASING A SHED/GARAGE FOR EXTRA STORAGE. 14X36 |
| E-21-426 | Electrical | 12/21/2021 | 200AMP MAIN BREAKER PANEL REPLACEMENT |
| E-21-372 | Solar | 10/27/2021 | ROOF MOUNTED SOLAR PV SYSTEM 13.2 KW 33 PANELS. STRUCTURAL UPGRADES REQUIRED |
| R-21-250 | Roof | 10/27/2021 | Structural upgrades for installation of 33 panel 13.2 kW roof mounted solar Panels |
| 17-01105 | Windows | 11/07/2017 | 6 REPLACEMENT WINDOWS |
| 15-00512 | Tank | 06/10/2015 | 275 GALLON ABOVE GRD TANK |
| 29587 | Residential | 07/10/2000 | ADDITION |
| 12345 | Residential | 10/01/1997 | A/C NO PE |
| B-97869 | Residential | 10/01/1997 | WOOD DECK |