| P-25-108 | Plumbing | 07/28/2025 | ROUGH AND FINISH THE MASTER BATHROOM: TOILET, FREE-STANDING TUB, DOUBLE VANITY, AND SHOWER. |
| E-25-201 | Electrical | 06/13/2025 | NEW LED LIGHTING IN HALLWAY TO (2) 3 WAYS, NEW LED LIGHTING IN BATHROOM TO (2) 3 WAYS, DUAL GRILLE B |
| R-25-127 | Interior Renovation | 04/29/2025 | REPLACING PLASTER WALLS WITH GYPSUM BOARD. INSTALLING NEW SUBFLOORS. COMBINING CLOSET WITH ADJACENT |
| R-25-126 | Kitchen | 04/27/2025 | KITCHEN REMODEL. FRAMING IN EXISTING WINDOWS AND DOORS. NEW CABINETS AND COUNTERTOP. NEW DRYWALL. EX |
| E-25-130 | Electrical | 04/21/2025 | BRING KITCHEN UP TO CODE FOR A KITCHEN REMODEL |
| 19-00399 | Electrical | 05/07/2019 | WIRE DUCTLESS SYSTEM |
| 19-00400 | HVAC | 05/07/2019 | DUCTLESS AC SYSTEM |
| 16-00291 | Electrical | 04/12/2016 | WIRE CONDENSER & AIR HANDLER |
| 16-00292 | HVAC | 04/12/2016 | INSTALL CONDENSER & AIR HANDLER |
| 35906 | Residential | 12/17/2004 | STABILIZE & REPAIR BARN |
| 35489 | Residential | 09/13/2004 | ADD GAR UNDER BARN/ALSO REPAIR CUPOLA, ROOF, ELEC |
| 35353 | Residential | 08/05/2004 | FOUNDATION REPAIR BARN |
| 34980 | Residential | 05/21/2004 | STABILIZE BARN/ONGOING |
| 34290 | Residential | 11/18/2003 | REPLACE BOILER/BUDERUS 238,000 BTU |
| 27584 | Residential | 04/22/1999 | |