| SW-24-14 | Pool | 08/28/2024 | INSTALLING A HOT TUB. |
| E-24-234 | Electrical | 07/15/2024 | POOL HOUSE AND HOT TUB WIRING |
| P-23-147 | Plumbing | 11/09/2023 | rough plumbing for new 1/2 bath in pool house, gas line to pool heater, water pipe to pool house |
| SW-23-19 | Pool | 10/19/2023 | 18X36 INGROUND POOL WITH STADIUM SEATING, CUSTOM BENCHES, AUTO COVER AND 7 FT OF DEPTH IN THE DEEP E |
| R-23-173 | Outbuilding/Yard Item | 10/16/2023 | BUILDING A 14 X 30 POOL HOUSE. MOSTLY OUTDOOR STRUCTURE, BUT IT WILL INCLUDE A SMALL BATHROOM, WITH |
| E-23-339 | Electrical | 10/10/2023 | In ground pool electrical |
| R-21-35-CO | CO Issued | 09/28/2023 | CERTIFICATE OF OCCUPANCY ISSUED 9/28/23 - BASEMENT FINISH IS SEPARATE OPEN PERMIT |
| E-23-292 | Electrical | 09/01/2023 | FINISH BASEMENT WIRING |
| P-23-114 | Bath | 08/30/2023 | New full bath in the basement |
| R-23-144 | Finished Bsmt | 08/30/2023 | FINISHING BASEMENT AND ADDING A FULL BATHROOM |
| TANK | | 03/06/2023 | ST-23-11 |
| ST-23-11 | Tank | 02/28/2023 | SET 1-500 GALLON LP TANK UNDERGROUND OFF RIGHT SIDE TOWARDS REAR CONNECT 1 ANODE BAG RUN YELLOW COAT |
| HAC-22-105 | Boiler | 05/23/2022 | New HVAC gas combination boiler and air handler |
| P-22-80 | Plumbing | 05/23/2022 | Rough in new plumbing for kitchen and 2 1/2 bath. Propane Direct vent on demand water heater. |
| E-21-271 | Electrical | 08/03/2021 | New house wiring and underground service |
| R-21-35 | New | 02/16/2021 | two story colonial with an attached garage |