| BRSW-23-229 | Roof | 12/22/2023 | RE ROOFING BUILDING AND INSTALLING 10 WINDOWS. PERMIT FEE FOR WHOLE PROJECT ( 13 CONDOS) WAS PAID UN |
| E-23-472 | Electrical | 11/17/2023 | REMEDIATE BY THE USE OF THE COPALUM CRIMP METHOD AT ALL 110/120V BRANCH CIRCUIT TERMINATION POINTS. |
| P-22-35 | Plumbing | 03/14/2022 | INSTALL NEW SHOWER VALVE, TUB ON EXISTING PIPING/WASTE. INSTALL NEW SHUT OFF AT TOILET AND VANITY, |
| E-22-69 | Electrical | 03/12/2022 | Swap out heater, thermostat, exhaust fan, receptical and switches. Existing wiring to remain.& |
| R-22-25 | Bath | 02/20/2022 | 2nd Floor Bathroom Renovation - New plumbing fixtures on existing locations/piping. New light |
| 08-00701 | Residential | 08/07/2008 | DECK |