| E-25-263 | Electrical | 08/08/2025 | NEW ELECTRICAL FROM PANEL TO CONDENSER. |
| HAC-25-154 | Air Conditioning | 08/08/2025 | THE NEW INSTALLATION OF DAIKIN BRAND 4MXM36AVJU9 CONDENSER WITH (2) MATCHING HEADS AND CONTROLS (SUN |
| BRSW-25-134 | Roof | 06/09/2025 | PARTIAL ROOF REPLACEMENT IN KIND. REMOVE AND REPLACE 22SQ ASPHALT SHINGLES.(SLOPES WITHOUT SOLAR PA |
| E-25-133 | Electrical | 04/21/2025 | WIRE TWO NEW BATHROOMS ONE IN BASEMENT ONE IN BEDROOM NEXT TO PRIMARY TO INCLUDE BATHROOM FANS 20 AM |
| ST-25-9 | Tank | 04/08/2025 | SET 1-120 GALLON VERTICAL LP TANK ON BLOCKS - LEFT SIDE REAR ON BLOCKS AGAINST THE HOUSE. RUN 30' O |
| P-25-45 | Bath | 03/20/2025 | Adding a full master bathroom upstairs and adding a full bathroom in the basement. |
| R-25-55 | Interior Renovation | 03/17/2025 | THE PROJECT IS TO TAKE A BEDROOM OUT AND ADD A MASTER BATHROOM AND ALSO ADD ANOTHER BATHROOM IN BASE |
| 15-00739 | Solar | 07/29/2015 | ROOF MOUNTED |
| 31904 | Residential | 05/09/2002 | PORCH |