| P-25-96 | Gas Line | 06/20/2025 | RUN NEW EXTERIOR UNDERGROUND LP GAS LINE FROM EXISTING LP TANKS TO OUTDOOR FIREPLACE. |
| BRSW-25-110 | Roof | 05/20/2025 | REMOVE SHINGLES AND REPALCE WITH GAF 30YR ARCH SHINGLES WITH 6' OF ICE BARRIER ON EVES WITH SYNTHETI |
| ST-25-6 | Tank | 03/07/2025 | INSTALL 2-100 GALLON ABOVEGROUND LP TANKS ON RIGHT SIDE OF HOUSE TO SUPPLY NEW HEATING SYSTEM. PIPI |
| E-25-58 | Electrical | 02/19/2025 | KITCHEN REMODEL. GUEST AND MASTERBATH REMODEL. REPLACE DEVICES THROUGH OUT THE HOME. ADD SMOKES TO C |
| P-25-25 | Plumbing | 02/19/2025 | PLUMBING ROUGH AND FINISH FOR ADDED FULL BATH, REMODELED 1/2 BATH/ LAUNDRY/ KITCHEN |
| R-25-34 | Remodel | 02/19/2025 | Kitchen and bathroom remodel |
| HAC-25-28 | HVAC | 02/13/2025 | REPLACE EXISTING HVAC SYSTEM WITH A LENNOX HIGH EFFICIENCY GAS FURNACE WITH AIR CONDITIONING. ALL NE |
| E-25-48 | Electrical | 02/07/2025 | 200 amp overhead service change |
| B-23944 | Residential | 10/01/1995 | HSE CO'D |