| R-25-180 | Chimney | 08/26/2025 | APPLY HEATSHIELD CERFRACTORY FLUE SEALANT TO ENTIRE FIREPLACE FLUE SYSTEM INCLUDING THE SMOKE CHAMBE |
| E-25-254 | Electrical | 08/01/2025 | 100 to 200 service upgrade. Wire 2 ton split unit. Install exterior gfi to service AC equipment. |
| HAC-25-125 | Air Conditioning | 07/24/2025 | INSTALLATION OF ONE LENNOX MINI SPLIT MODEL MMLD024S6M-1P WITH TWO INDOOR UNITS MODELS MWZD015M6-1P |
| BRSW-25-109 | Doors | 05/16/2025 | Remove and replace two entry doors |
| BRSW-25-70 | Doors | 04/11/2025 | REMOVE AND REPLACE ONE ENTRY DOOR, NO STRUCTURAL CHANGES. |
| BRSW-25-22 | Doors | 01/22/2025 | REMOVE AND REPLACE ENTRY DOOR WITH A NEW VINYL SLIDING GLASS DOOR IN EXISTING FRAMEWORK. |
| BRSW-24-224 | Siding | 09/26/2024 | REMOVE EXISTING WOOD SIDING, INSTALL MOISTURE RESISTANT 3/8" INSULATION. TAPE THE SEAMS AND RE INSTA |
| BRSW-24-226 | Windows | 09/26/2024 | REMOVE AND REPLACE 3 WINDOWS WITH NEW VINYL HOPPER WINDOWS IN EXISTING FRAMEWORK. |
| R-24-175 | Repair | 09/04/2024 | Due to water damage in the kitchen, I had to remove the cabinets, sheetrock, and insulation on 20 1/ |
| E-24-285 | Kitchen | 08/29/2024 | Kitchen remodel |
| BRSW-24-191 | Windows/Doors | 08/06/2024 | REMOVE 11 WINDOWS AND REPLACE WITH 8 NEW VINYL DOUBLE HUNG WINDOWS, ONE VINYL 2-LITE SLIDER, ONE VIN |
| HAC-23-16 | Boiler | 01/26/2023 | WE ARE GOING TO REMOVE THE EXISITNG OIL BOILER. WE WILL THEN ADD 2-120 PROPANE TANKS OUTSIDE WITH NE |
| Residential | 10/01/1991 | HSE CO'D |