2021.2857 | Building | 10/14/2021 | finish basement: Sheetrock for full bathroom laundry - space with open space to TV area/family roo |
2021.1309 | Plumbing | 05/12/2021 | install 1 lavie 1 toilet 1 shower 1 kitchen sink 1 gas hot water heater - in each apartment (total t |
2021.1076 | Building | 05/06/2021 | demo rear interior staircase install 2x8 joists to remove stairs and extend the floor - replace som |
2020.2249 | Electrical | 09/14/2020 | install 4 meter bank - new wiring 3 family 100% gutted install lights switches outside lights smoke |
2020.2090 | Building | 08/28/2020 | install twenty (20) vinyl replacement windows - Three family house |
2020.2091 | Roof | 08/28/2020 | strip and re-roof three family house - (not plywood) |
2020.2092 | Siding | 08/28/2020 | install vinyl siding - Three family house |
2018.1705 | Plumbing | 06/22/2018 | RENOVATE 3 FLOORS - NEW PLUMBING - 3 FAMILY HOUSE |
2018.1706 | Plumbing | 06/22/2018 | INSTALL 3 GAS FIRED HEATING SYSTEM, GAS PIPE, TEST |
2018.1515 | Remodel | 06/21/2018 | REPAIR FRON & REAR PORCHES & STAIRS - SHEETROCK |