2023.0506 | Electrical | 02/24/2023 | wire gutted 3rd floor |
2022.3457 | Building | 02/08/2023 | Romodel the third floor in the house. Installing new installation on all the walls and ceiling. Inst |
2022.0148 | Electrical | 01/21/2022 | looking to make safe and energize 3 meter socket 200a service. crs |
2021.3443 | Building | 11/22/2021 | adding 1/2 bathroom next to kitchen |
2021.3522 | Electrical | 11/22/2021 | Finish work only first and second floors wire common areas wire first and second floor boilers and e |
2021.3346 | Plumbing | 11/05/2021 | relocate 2nd floor bathroom above the 1st floor new 1/2 - bath new soil and vent connect to the exis |
2021.2020 | Electrical | 07/16/2021 | new wiring completely gutted install switches duplex outlets smoke - alarms lights a/c breakers on t |
2021.1419 | Mechanical | 05/18/2021 | installation and replacement of baseboard radiators and - hydronic boiler for 1st floor. Three fami |
2021.1198 | Plumbing | 05/03/2021 | first and second floor plumbing updated to code - replacement of damage DWV with new pipe ABS - sam |
2021.0287 | Electrical | 02/10/2021 | rough 2nd finish 1st floor 2nd floor apartments - basement lights and common areas/smoke alarms - Th |
2020.3371 | Building | 01/08/2021 | FIRST AND SECOND FLOOR REMODEL/DRYWALL/INSULATION - - multi family |
2020.3371 | Remodel | 01/08/2021 | FIRST AND SECOND FLOOR REMODEL/DRYWALL/INSULATION
|
2020.3283 | Roof | 12/02/2020 | Strip and re-roof three family house |
2017.1885 | Electrical | 07/19/2017 | OWNERS METER ADD PANEL AND COMMON AREA LIGHTING |
2017.1257 | Plumbing | 05/18/2017 | RENOVATE 3 FULL BATHS - 3 KITCHENS - PVC VENTS- DRAIN - PEX |